River Oaks Area 6 – Basin E
This project consists of the
installation of about 10,000 liner feet (LF) of gravity sewer with manholes and
approximately 500 LF of water main,
Construction
Manager: Annachiara d’Ettore
Inspector: Vanise Ford / CMTS
Contractor: Conquest Engineering Group
Designer: Camp Dresser & McKee
Community Outreach Contact:
Mario Diaz
Notice to Proceed: October 29, 2007
Completed Improvements
·
The contractor
completed the 6” water main with services to the property. Currently, it is not
connected.
·
All taps are
complete for the 6” water main.
·
Asphalt paving is
complete on SW 19 Street between SW 13 Avenue and Coconut Drive with the
exception of the correction of edge of pavement.
·
The 8” sewer line
is installed on:
- SW 19
Street between SW 12 Avenue and Coconut Drive
- SW 13
Avenue between SW 19 Street and SW 17 Street
- SW 18
Court between SW 12 Avenue and Coconut Drive
- SW 18
Street between SW 12 Avenue and Coconut Drive
- SW 14
Avenue between SW 18 Street and SW 17 Street
- SW 17
Street between SW 14 Avenue and Coconut Drive
-
Coconut Drive from SW 17 going north to dead end
·
Sewer laterals
are installed on all streets mentioned with the exception of SW 18 Street
between SW 13 Avenue and Coconut Drive.
Ongoing
Improvements
- The
contractor is installing 8” PVC sewer pipe on Coconut Drive between SW 18
Street and SW 17 Street.