River Run - Area 4 – Basin E Phase I
This
project includes the installation of gravity sewer with manholes and a force
main.
Construction Manager:
Annachiara d’Ettorre
Inspector:
Fran Grant/CMTS
Contractor:
Conquest Engineering
Designer:
Keith & Schnars
Community Outreach Contact:
Mario Diaz
Estimated Completion Date:
Third Quarter of 2008
Ongoing
Improvements
·
In the area of SW
28 Avenue between SW 14 Street and the end of roadway construction:
-
Manholes and sewer pipe have been installed
- Base
and sub-base road restoration is complete between SW 14 Street and SW 16
Street
-
Ductile Iron Pipe (DIP) laterals are complete to the east side
-
Current activities in this area include brick pavers restoration and
completion of base and sub-base road restoration along SW 28 Avenue
-
Future work in this area includes asphalt restoration and testing
·
In the area of SW
29 Terrace between SW 14 Street and SW 16 Street:
- The
contractor has installed:
§
Manholes 49, 50,
51 and 52
§
965’ of sewer
pipe
§
320’ of forcemain
§
Sub Base/Limerock
Base/Pavement starting on SW 17 Street for approximately 300’
§
5 single DIP
laterals and 1 double DIP laterals
o
Current
activities in this area include the installation of PVC sewer between SW 16
Street and SW 14 Street
o
Future work
includes:
§
Forcemain
completion
§
Air Release Valve
(ARV) installation
§
PVC sewer
installation between manhole 50 and 33 (about 300’)
§
Manhole 33
installation
§
Restoration