Riverland Area 2 East – Basin A, Basin C
This
project includes the installation of two new wastewater pump stations, 26,281
linear feet of gravity sewer pipe, 98 manholes, 3,630 linear feet of 6” DIP
force main, 185 linear feet of 8” DIP force main and connections to existing
sanitary and force main systems with appurtenances and all restoration.
Construction Manager: Doug
VanNote
Inspector:
Ronaldo Nunez
Contractor:
Asphalt Consultant, Inc.
Designer: K&S
Community Outreach Contact: Melissa Buckner
Notice to Proceed:
December 31, 2007
Estimated Completion Date: Second Quarter of 2009
Completed Improvements
·
The installation
of sewer is complete on:
o
SW 24
Avenue between Davie Boulevard and SW 10 Street
o
SW 25 Avenue
between Davie Boulevard and SW 10 Street
o
SW 26 Avenue
between Davie Boulevard and SW 11 Court
o
SW 26 Terrace
between Davie Boulevard and SW 11 Court
o
Riverland Drive
o
SW 6 Street
o
SW 9 Street
between SW 26 Avenue and SW 27 Avenue
o
SW 8 Street
between SW 26 Avenue and SW 27 Avenue
o
SW 7 Street
between SW 26 Avenue and SW 27 Avenue
o
SW 6 Court
between SW 26 Avenue and SW 27 Avenue
o
SW 26 Avenue
between SW 6 Court and the dead end
o
SW 10 Street
o
SW 27 Avenue
Ongoing Improvements
·
The contractor is
installing sewer on SW 24 Avenue between SW 9 Street and SW 10 Street. When this
area is complete, the contractor is scheduled to begin sewer installation on SW
8 Street between SW 24 Avenue and SW 26 Avenue and then on SW 24 Avenue between
SW 8 Street and SW 7 Street.
·
The final lift of
asphalt paving as been placed on:
o
SW 11 Court
between SW 26 Avenue and SW 27 Avenue
o
SW 26 Avenue
between Davie Boulevard and SW 11 Court
o
SW 26 Terrace
between Davie Boulevard and 11 Court
Restoration
·
Currently,
restoration is taking place on SW 22 Terrace.