Sewer Certification Process

After the construction of the sewers and pump station (if applicable) is complete, the certification process can finally begin. The process consists of gathering of information and data (record drawings and test reports) to create a "certification package" for the construction project that will be submitted to Broward County Environmental Protection Department. This process could take up to 150 days depending on the complexity of the project.   

The records drawings are developed by the City Surveyor based on field data collected during the construction period. The purpose of the record drawings is to show how the project was actually constructed compared to how it was originally designed. This accounts for any changes made so that the City has an accurate understanding of where the pipes are located. Another major component of the certification package is the test data demonstrating that the pipes have the proper slope, are installed correctly and that they don’t leak. There are three separate tests conducted on every pipe. Once both the record drawings and test results have been completed, they are compiled into the package for submittal to the County.

After submitting the package, the County has 30 days to review the package and determine that it is complete. If the County has questions, they are addressed and the 30 day period starts again. Once the package is deemed sufficient, the county can certify the area. Upon approval (certification) from the County, a Certificate of Completion is drawn up for the City Engineer to sign. Once the certificate is signed, property owners in the project area are notified of when they will be required to connect to the new sewer system.