WaterWorks 2011 City of
Fort Lauderdale Capital Improvements Program
Overview
The WaterWorks
2011 Program entails the modernization of the City of Fort
Lauderdale water and wastewater infrastructure to be completed
over a period of 10 to 20 years. The majority of the improvements
will be completed by 2011 using a Program Management approach and a
dedicated Program Management Team (PMT). The program management
processes, tools, and skills developed during execution of the
Program are anticipated to set the stage for the City to continue
with the implementation of additional capital improvements that may
be needed beyond the first 10 years of the Program.
Included below is a
brief description of the improvements currently planned as part of
the Program on the basis of the City of Fort Lauderdale Water and
Wastewater Master Plan (CH2M HILL and Hazen and Sawyer, February
2001). Approximately $320 million are planned for improvements to
the water system and $230 million for improvements to the wastewater
system.
The initial year of
Program Management activities will focus on detailed planning
activities that will further define the elements and delivery
strategy for the individual projects within the Program.
Water System
Improvements
Near term
improvements to the water system include miscellaneous wellfield
upgrades, a new membrane softening treatment facility at the
Peele-Dixie WTP, multiple rehabilitation/upgrade projects at the
Fiveash WTP, and new pipelines and storage tanks in the distribution
system. Long-term improvements include wellfield upgrades and
membrane filtration technology upgrades at the Fiveash WTP, and
distribution system piping improvements.
Wastewater System
Improvements
Improvements to the
wastewater system include the addition of previously unsewered areas
into the collection system, modification of the existing collection
system, repair and upgrade of the transmission system, and
improvements at the wastewater treatment plant.
The proposed
transmission system improvements consist primarily of pump
replacements to upgrade equipment and alleviate hydraulic
deficiencies. A major new force main along Davie Boulevard is
proposed in the near-term to provide the conveyance capacity that
will be needed for connection of new sewered areas, and to provide
an alternate flow path into the treatment plant. Longer term, three
additional force main segments are proposed. These are needed to
relieve localized capacity problems and/or to provide additional
capacity for connection of presently unsewered areas.
Proposed collection
system improvements include rehabilitation of existing sewers and
construction of new sewers in presently unsewered areas. The
coordinated system-wide program of sewer system rehabilitation was
initiated in late 2000 and will be ongoing throughout the 20-year
planning period. Initial efforts will focus on the identification
and reduction of peak flows associated with rainfall-related
infiltration/inflow. Expenditures for contracted sewer
rehabilitation of $3.5 million per year are recommended to achieve
the objectives of the program.
Eighteen unsewered
areas have been delineated in the service area. Construction of new
sewers in each of these areas is proposed, with the construction
being phased over the next decade.
With the
anticipated re-rating of George T. Lohmeyer RWWTP to a capacity of
54 mgd, the plant will have sufficient capacity for many years. No
expansion of treatment or effluent disposal capacity is recommended,
but a number of renewal and replacement projects are proposed.
Capital
Improvements Summary
The projects
included in the approved Master Plan are categorized as near-term
(through FY 2005) and long-term (through FY 2020), and are further
categorized by type of system (water, wastewater) and by function
(supply, treatment, distribution, collection, transmission, and
disposal). A summary of projected investments in each category
through the year 2020 are shown below.
Water System
Capital Improvement Summary
|
Category
|
Near-term
Cost |
Long-term
Cost |
Total Cost
|
|
Raw Water
System |
$4,900,000
|
$7,350,000
|
$12,250,000
|
|
Water
Treatment |
$57,040,000
|
$90,000,000
|
$147,040,000 |
|
Water
Distribution |
$50,870,000
|
$112,840,000 |
$163,710,000 |
|
Total
|
$112,810,000 |
$210,190,000 |
$323,000,000 |
|
|
|
|
|
Wastewater System
Capital Improvement Summary
|
Category
|
Near-term
Cost |
Long-term
Cost |
Total Cost
|
|
Collection
and Transmission System |
|
|
|
City
Transmission System |
20,055,000
|
11,600,000
|
31,655,000
|
|
Regional
Transmission System |
1,040,000
|
490,000
|
1,530,000
|
|
Collection
System |
31,940,000
|
126,260,000
|
158,200,000
|
|
Subtotal
|
|
|
|
|
Treatment
System |
20,720,000
|
21,019,000
|
41,739,000
|
|
Total
|
$73,755,000
|
$159,369,000 |
$233,124,000 |
|
|
|
|
|